Swimming Pool Construction Here is the detail of our concrete swimming pool construction steps:
- Marking out of the swimming pool area and drilling piling foundations
-
Excavation for swimming pool
-
Site overlay to provide concrete screed swimming pool base
-
Block-work external molding walls of the swimming pool
-
Double reinforcement steel bar cages set 20 cm apart
-
PVC Pipe work installation and swimming pool equipment installation including swimming pool lights
-
Metal shuttering or Plywood molding walls for concrete pour
-
Pouring concrete floor and walls including high strength water-proof additive and dry concrete rubber joints
-
Water repellent surface filler sand and cement mix
-
Tiling mainly Grade A Glazed Ceramic and high quality underwater mold resistant grout
-
Sand wash finish, decking or tiling detail surrounding the swimming pool
- Commissioning - (filling of the pool, turning on the system, chemical treatment and balance of the Ph and chlorine levels, cleaning of the swimming pool)
Circulation
The Purpose of the circulation system (filter system) is to:
- Pass all the water through the swimming pool filter and/or salt system
- Provide good cleaning by ensuring the salt system and other chemicals are evenly distributed throughout the swimming pool
- Eliminate dead spots in the swimming pool where bacteria, debris and other matter may collect.
There are several factors that affect circulation:
- Hydraulic efficiency of the swimming pool pump, the pipe work and the equipment.
- How often and what length of time the swimming pool pump runs for.
- Position of returns to pool inlets
- The shape of the swimming pool.
- Prevailing wind conditions and other relevant environmental factors.
Common dead spots in swimming pools include:
- behind ladders and light fittings
- the deep end or bottom of some swimming pools.
The Problem with a number of pool designs is that circulation is over looked in favor of looks. In some swimming pools, there are dead spots. Dead Spots are areas where water is not flowing or trapped due to poor swimming pool design and or ladders and step placement or improperly positioned pool returns. Water that is trapped is neither being filtered or properly replenished with chemicals and may bring on rapid algae growth which is seen by green areas on the tiles and grout lines.
|
|
10 year construction warranty
Fully trained staff
High quality materials
Daily construction updates
NO sub-contractors
Equipment training
Unique designs/sizes
Automatic systems
No hidden extras
|
Hayward Salt System
From 45,000 THB
Hayward Super Pump
From 15,000 THB
Hayward Sand Filter
From 12,000 THB
Hayward Super II Pump
From 20,000 THB
Emaux SC Series Pump
From 9,000 THB
LED Pool Lights
From 3,000 THB
Emaux Salt Unit
From 22,000 THB
|
|
|
|
บริษัท ริคการ์ดส์ คอนสตรัคชั่น จำกัด : 65/39 หมู่ 12 เทพประสิทธิ์ ซ.7 ต.หนองปรือ อ.บางละมุง จ.ชลบุรี 20150
Rick Gards Construction Company Limited : 65/39 Thep Prasit Road, Soi 7, Nong Prue, Bang Lamung, Chon Buri 20150 THAILAND
Pattaya Swimming Pools is the trading name of Rick Gards Construction Company Limited DBD Registered (0205557039897)
© 2011 - 2022 Pattaya Swimming Pools. All rights reserved. |
| |
|